Teraco CT1 Rondebosch

Also known as Teraco CT1, Teraco Cape Town 1, CT1 Rondebosch

Status
Expanding
Location
Cape Town, South Africa
Operator
Teraco
IT load
3 MW running, 5 MW planned
Timeline
Not disclosed
Last verified

Overview

The Daily Maverick article identifies a 60MW Cape Town expansion as Teraco's project and links to Teraco's CT1 Rondebosch announcement. Teraco's own announcement reports CT1 current critical IT load of 3MW and a further 2MW expansion, so the structured CT1 capacity fields use Teraco's company-official figures.

Cooling method, water demand, and AI-specific capacity remain unconfirmed in the reviewed sources.

IT load — full buildout
5 MW
Teraco reports CT1 will expand from 3MW by a further 2MW of critical IT load.
confirmed Source [s1] Source [s2]
IT load — current
3 MW
confirmed Source [s2]
Building area
3,500 m²
Teraco reports 2,500 square meters of current data halls plus a 1,000 square meter expansion.
confirmed Source [s2]

Power in context

5 MW of IT load is roughly the average demand of 14,500 South African households (at 250 kWh per month).

That is 0.3% of Cape Town's peak grid demand (1,676 MW).

It is 0.02% of South Africa's effective grid capacity (~30 GW available).

Comparable to a mid-size cloud data centre.

Announced versus operating capacity

AI cooling readiness
Not assessed

Cooling adequacy for AI workloads has not been independently assessed for this facility.

AI racks draw around 100 kW each, about ten times a conventional rack, so rack-level liquid cooling is the key differentiator. Training versus inference

Grid utility
City of Cape Town
reported Source [s1]
Grid carbon intensity
900 g CO₂/kWh
City of Cape Town large loads are ultimately Eskom-backed; grid-level figure, not facility-specific.
estimated Source [s1]

Grid carbon in context

900 g CO₂/kWh: very high — coal-heavy grid. That is 2.1 times the global average of 436 g (IEA, 2022). For comparison, France is about 60, the UK about 175 and the US about 400.

Grid-level estimate. PPAs and on-site renewables may lower the effective footprint.

Water source
Not disclosed
Water stress (WRI)
High
Jurisdiction
South Africa
confirmed Source [s1]
Data residency
Data physically resident in South Africa under POPIA jurisdiction
  • General cloud
  • Colocation

Carrier-neutral colocation campus operated under the Teraco brand. Daily Maverick describes a 60MW Cape Town expansion by Teraco but does not confirm AI-specific workloads or GPU capacity.

Claims are contested or still-evolving assertions, kept apart from sourced facts. A disputed claim is not a confirmed fact.

c1 Capacity expansion
disputed

Daily Maverick reports a 60MW Teraco expansion in Cape Town and links to the CT1 Rondebosch announcement. Teraco's own CT1 release reports 3MW current critical IT load plus a 2MW expansion, not 60MW at CT1. The structured capacity fields follow Teraco's company-official CT1 figures.

First observed 2026-04-28 last reviewed 2026-06-29
  1. [s1]
    New data centres set to swallow 34% of Cape Town's current electricity supply, Daily Maverick

    local journalism Retrieved 29 June 2026 Not yet archived

  2. [s2]
    Teraco announces CT1 data centre expansion in Rondebosch, Cape Town, Teraco

    company official Retrieved 29 June 2026 Not yet archived

What these source types mean
local journalism
Local news outlets; variable editorial standards, used for leads and corroboration.
company official
Press releases, investor relations filings, and product pages from the operating company.