Skip to content
Africa Compute Tracker

Equinix Cape Town Airport Data Centre 2

Also known as Equinix Cape Town Airport Site 2, Equinix King David Golf Club Data Centre 2

Status
Announced
Location
Cape Town, South Africa
Operator
Equinix
IT load
Not disclosed
Timeline
Not disclosed
Last verified

Overview

This record replaces the provisional equinix-ct3-cape-town identity. The source does not give official Equinix facility codes for the two proposed Cape Town sites.

Daily Maverick reports that the two proposed Equinix data centres are next to Cape Town International Airport, on the old King David Golf Club course, and together have a combined 160MW maximum-case demand. This record uses an equal 80MW split only because the source does not disclose per-site demand.

Total facility power
80 MW
Daily Maverick reports 160MW combined for two proposed Equinix sites; this record uses an equal split because per-site demand is not disclosed.
estimated Source [s1]
Cooling
Air
Equinix told Daily Maverick the Cape Town data centres would use dry, air-based cooling systems.
reported Source [s1]
AI cooling readiness
Not assessed

Cooling adequacy for AI workloads has not been independently assessed for this facility.

AI racks draw around 100 kW each, about ten times a conventional rack, so rack-level liquid cooling is the key differentiator. Training versus inference

Grid utility
City of Cape Town
reported Source [s1]
Grid carbon intensity
900 g CO₂/kWh
Grid-level Eskom-backed estimate, not facility-specific.
estimated Source [s1]
Backup
diesel
Daily Maverick reports city officials said data centres typically require near-100% backup, usually diesel generators plus UPS; Equinix had not disclosed generator details.
estimated Source [s1]

Grid carbon in context

900 g CO₂/kWh: very high — coal-heavy grid. That is 2.1 times the global average of 436 g (IEA, 2022). For comparison, France is about 60, the UK about 175 and the US about 400.

Grid-level estimate. PPAs and on-site renewables may lower the effective footprint.

Water source
None
Water stress (WRI)
High
Jurisdiction
South Africa
confirmed Source [s1]
Data residency
Data physically resident in South Africa under POPIA jurisdiction
  • General cloud
  • Colocation

One of two proposed Equinix data centres next to Cape Town International Airport on the old King David Golf Club course. Equinix describes the combined 160MW as a maximum-case scenario rather than committed or immediately deliverable capacity.

  1. [s1]
    New data centres set to swallow 34% of Cape Town's current electricity supply, Daily Maverick

    local journalism Retrieved 29 June 2026 Not yet archived

What these source types mean
local journalism
Local news outlets; variable editorial standards, used for leads and corroboration.