Capacity
What is IT load? →- IT load — current
- 40 MW
- Total facility power
- 80 MW
- Building area
- 45,000 m²
The technical sheet reports 40MVA available IT power load across the data centre footprint; stored as MW-equivalent pending schema support for MVA.
The technical sheet reports 80MVA total power; stored as MW-equivalent pending schema support for MVA.
The technical sheet reports over 45,000 square meters of total space.
Infrastructure
Tier guide →- Cooling
- unknown
The technical sheet reports N+1 cooling redundancy and environmental controls but does not identify a cooling technology.
Cooling adequacy for AI workloads has not been independently assessed for this facility.
AI data centres require ~100 kW/rack (10× conventional). Liquid cooling at rack level is the key differentiator. Learn more →
Power
PPAs & wheeling →- Backup
- diesel
The technical sheet reports diesel backup generators with a minimum 48 hours of fuel under full-load design conditions.
Governance
Data residency →Workload Profile
Training vs inference →Teraco describes the Isando campus as a carrier-neutral colocation and interconnection hub with cloud on-ramps. No public source reviewed here confirms dedicated AI training capacity, GPU counts, or active liquid-cooled AI deployments.
Entities
Operator
Teraco
Owner
Digital Realty
Location
Isando, Gauteng, ZA
-26.1380, 28.1987
exact precisionStatus History
-
expanded
2024-01-01
The 2023 technical sheet described JB5 as a planned 2024 addition to the Isando campus.
-
operational
2009-01-01
Teraco JB1 is an older operational facility; exact opening date not verified in the cited sources.
Record
- ID
- teraco-isando-campus
- First tracked
- 2026-06-29
- Last verified
- 2026-06-29
Sources
- s1
- s2 Teraco JB1 + JB3 Isando Campus technical specifications, PDF retrieved from the Equinix/Teraco site and stored in data/sources/2023-Teraco-Tech-Spec-Isando-Campus.pdf — Teracocompany official retrieved 2026-06-29 not yet archived
About these source tiers
Press releases, investor relations filings, and product pages from the operating company.
Full ranking: Methodology · Glossary