Equinix Cape Town Airport Data Centre 1
AnnouncedAlso known as: Equinix Cape Town Airport Site 1 · Equinix King David Golf Club Data Centre 1
Overview
Capacity
What is IT load? →- Total facility power
- 80 MW
Daily Maverick reports 160MW combined for two proposed Equinix sites; this record uses an equal split because per-site demand is not disclosed.
Infrastructure
Tier guide →- Cooling
- air
Equinix told Daily Maverick the Cape Town data centres would use dry, air-based cooling systems.
Cooling adequacy for AI workloads has not been independently assessed for this facility.
AI data centres require ~100 kW/rack (10× conventional). Liquid cooling at rack level is the key differentiator. Learn more →
Power
PPAs & wheeling →- Grid utility
- City of Cape Town
- Grid carbon intensity
- 900 g CO₂/kWh
- Backup
- diesel
Grid-level Eskom-backed estimate, not facility-specific.
Daily Maverick reports city officials said data centres typically require near-100% backup, usually diesel generators plus UPS; Equinix had not disclosed generator details.
Grid carbon context
900 g CO₂/kWh — Very high — coal-heavy grid
2.1× the global average (436 g CO₂/kWh, IEA 2022). Compare: France ~60, UK ~175, US ~400 g CO₂/kWh.
Grid-level estimate. PPAs and on-site renewables may reduce the effective carbon footprint.
Water
Water stress →- Water source
- none
- Water stress (WRI)
- high
Governance
Data residency →- Jurisdiction
- South Africa
- Data residency
- Data physically resident in South Africa under POPIA jurisdiction
Workload Profile
Training vs inference →One of two proposed Equinix data centres next to Cape Town International Airport on the old King David Golf Club course. Equinix describes the combined 160MW as a maximum-case scenario rather than committed or immediately deliverable capacity.
Entities
Operator
Equinix
Owner
Equinix
Location
Cape Town, Western Cape, ZA
-33.9706, 18.5978
city precisionStatus History
-
announced
2026-04-13
Civil-society objection dated 2026-04-13 challenged the rezoning application for two proposed Equinix data centres.
Record
- ID
- equinix-cape-town-airport-dc1
- First tracked
- 2026-05-11
- Last verified
- 2026-06-29
Sources
- s1 New data centres set to swallow 34% of Cape Town's current electricity supply — Daily Mavericklocal journalism retrieved 2026-06-29 not yet archived
About these source tiers
Local news outlets; variable editorial standards, used for leads and corroboration.
Full ranking: Methodology · Glossary